Bunker MGO (Nirud Fuel Trading Sdn Bhd) for Operation FPSO Bunga Kertas
Location: PTP, Johor Bahru, Malaysia.
Bunker MGO (Nirud Fuel Trading Sdn Bhd) Geosurvey.
Vessel: MV KEYFIELD HELMS
Location: Johor Port Berhad
Project timeline: 21 Aug 2021
Supply of hydraulic fuel by (Nirud Fuel Trading Sdn Bhd)
Vessel: JM Sutera 5
Location: Melaka Anchorage
Project Timeline: 1 – 2 Oct 2021
UNWILD INSPECTION
Vessel: JM Sutera 6
Location: Melaka Anchorage
Project Timeline: 19 – 20 Oct 2021
Sea Chest, Bottom Hull, Bow Thruster, Rudder – U/W Cleaning
BWTS RETROFITTING
Vessel: OVL VENTURE 1
Location: Workshop base fabrication.
Project Timeline (fabrication): 17 Jan – 03 Feb 2022
Project Timeline (retrofiting): 25 Jan – 11 Feb 2023
FABRICATION & HVAC
Location: Workshop base fabrication
Project Timeline: 14 Feb – 30 June 2022
Fabrication of Frames, Structure For Replica Mulu Cave To Singapore Zoo.
STAINLESS STEEL TANK INSPECTION & REPAIR ON INTERNAL WELDMENTS
Location: Kerry Tampoi Plant
Project Timeline: 2 – 7 May 2022
LOAD TEST-HOSE HANDLING CRANE 25MT (PORT & STBD)
Location: Tompok Utara Anchorage
Project Timeline: 31 May 2022
To carry out load test using load cell, water bag, shackle’s.
BWTS RETROFITTING
Vessel: JM Sutera 2
Location: Workshop base fabrication.
Project Timeline (fabrication): June 2022
Material handling & Construction
BWTS RETROFITTING
Vessel: JM Sutera 1
Location: Workshop base fabrication.
Project Timeline (fabrication): July 2022
Material handling & Construction
BWTS RETROFITTING
Vessel: JM Sutera 3
Location: Workshop base fabrication.
Project Timeline (fabrication): Aug 2022
Material handling & Construction
BWTS RETROFITTING
Vessel: JM Sutera 1
Location: Johor Anchorage
Project Timeline: Oct 2022
DECK REPAIRS AND FABRICATION CONDUIT PIPES & CARGO HATCHES & GIRDERS
Vessel: JM Sutera 5
Location: Workshop base fabrication
Project Timeline: Feb 2023
Design & Construction Of Fire Damper
Vessel: Best Voyager
Location: Johor bahru Yard
Project Timeline: 23 Nov 22
Installation Location: MMHE, Johor Bahru.
Installation Timeline: 17th Mei 23
BWTS RETROFITTING
Vessel: JMS 8
Location: Melaka anchorage
Project Timeline: 7th Mei 2023
Under water inspection and cleaning
Vessel: LNG IMO
Location: MMHE
Project Timeline: June 2023
BWTS RETROFITTING LNG (Installation)
BOMBA HYD PIPE FABRICATION & INSTALLTION
Vessel: N.A
Location: Banting, Selangor, Malaysia.
Project Timeline (fabrication): Aug 2023
Procurement, Construction & Commisioning