MILESTONES

COMPLETED PROJECT

CLIENT: T7 GLOBAL BERHAD

Work Description

Bunker MGO (Nirud Fuel Trading Sdn Bhd) for Operation FPSO Bunga Kertas

MTIDE ENGINEERING & TRADING PTE.LTD

Work Description

Location: PTP, Johor Bahru, Malaysia.

Bunker MGO (Nirud Fuel Trading Sdn Bhd) Geosurvey.

HELMS

Work Description

Vessel: MV KEYFIELD HELMS
Location: Johor Port Berhad
Project timeline: 21 Aug 2021

Supply of hydraulic fuel by (Nirud Fuel Trading Sdn Bhd)

JASA MARIN

Work Description

Vessel: JM Sutera 5
Location: Melaka Anchorage
Project Timeline: 1 – 2 Oct 2021

UNWILD INSPECTION

JASA MARIN

Work Description

Vessel: JM Sutera 6
Location: Melaka Anchorage
Project Timeline: 19 – 20 Oct 2021

Sea Chest, Bottom Hull, Bow Thruster, Rudder – U/W Cleaning

APM SERVICES SDN BHD

Work Description

BWTS RETROFITTING
Vessel: OVL VENTURE 1
Location: Workshop base fabrication.
Project Timeline (fabrication): 17 Jan – 03 Feb 2022
Project Timeline (retrofiting): 25 Jan – 11 Feb 2023

ENEON SDN BHD

Work Description

FABRICATION & HVAC
Location: Workshop base fabrication
Project Timeline: 14 Feb – 30 June 2022

Fabrication of Frames, Structure For Replica Mulu Cave To Singapore Zoo.

Invert Robotics - Kerry Ingredients (M) Sdn Bhd

Work Description

STAINLESS STEEL TANK INSPECTION & REPAIR ON INTERNAL WELDMENTS
Location: Kerry Tampoi Plant
Project Timeline: 2 – 7 May 2022

AWH Sdn Bhd

Work Description

LOAD TEST-HOSE HANDLING CRANE 25MT (PORT & STBD)
Location: Tompok Utara Anchorage
Project Timeline: 31 May 2022

To carry out load test using load cell, water bag, shackle’s.

APM SERVICES SDN BHD

Work Description

BWTS RETROFITTING
Vessel: JM Sutera 2
Location: Workshop base fabrication.
Project Timeline (fabrication): June 2022

Material handling & Construction

APM SERVICES SDN BHD

Work Description

BWTS RETROFITTING
Vessel: JM Sutera 1
Location: Workshop base fabrication.
Project Timeline (fabrication): July 2022

Material handling & Construction

APM SERVICES SDN BHD

Work Description

BWTS RETROFITTING
Vessel: JM Sutera 3
Location: Workshop base fabrication.
Project Timeline (fabrication): Aug 2022

Material handling & Construction

JM SUTERA 5

Work Description

BWTS RETROFITTING
Vessel: JM Sutera 1
Location: Johor Anchorage
Project Timeline: Oct 2022

DECK REPAIRS AND FABRICATION CONDUIT PIPES & CARGO HATCHES & GIRDERS

JM SUTERA 5

Work Description

Vessel: JM Sutera 5
Location: Workshop base fabrication
Project Timeline: Feb 2023

Design & Construction Of Fire Damper

APM SDN BHD

Work Description

Vessel: Best Voyager
Location: Johor bahru Yard
Project Timeline: 23 Nov 22
Installation Location: MMHE, Johor Bahru.
Installation Timeline: 17th Mei 23

BWTS RETROFITTING

JM SUTERA 8

Work Description

Vessel: JMS 8
Location: Melaka anchorage
Project Timeline: 7th Mei 2023

Under water inspection and cleaning

GOLTEN SG - BW

Work Description

Vessel: LNG IMO
Location: MMHE
Project Timeline: June 2023

BWTS RETROFITTING LNG (Installation)

RESONAC GRAPHITE MALAYSIA SDN BHD

Work Description

BOMBA HYD PIPE FABRICATION & INSTALLTION
Vessel: N.A
Location: Banting, Selangor, Malaysia.
Project Timeline (fabrication): Aug 2023

Procurement, Construction & Commisioning